So much going on!
Framing is just about finished - got the trim around the edges of the roof. Roofing goes on this weekend!

Work started on getting our water line installed - we had to bring up the main line 350 feet through the east side of the property. It has created a great trail to get down the side of the property and out the back. There are more residential roads on the back/north side of the property that will be more fun to walk MacGyver on so this should help us get there!


View of the back side of the house coming up from where the water line is.

Heating is getting installed.

Heating vents.

Windows! These are the ones in the great room - they are great and so big!

Windows in master bedroom (only 1 installed so far).

The rest of the windows to be installed.

All the showers/tubs are installed and initial plumbing is complete.
Downstairs shower/tub for guest room.

Kids bathroom.

Master bath.

We aren't near a fire hydrant, so we have to have a sprinkler system throughout the house.